damerell: (trains)
posted by [personal profile] damerell at 04:17pm on 23/09/2011
On the other hand, that's nothing new. Think of the transition from semaphore to colour-light signalling, and from individual signalboxes to centralised boxes; the construction of the BR standard steam locomotives, and the diesel and electric designs that replaced them up to the Class 43s and Class 91s; the design and construction of Mk3 and Mk4 coaches, and various newer DMU/EMU types; the introduction of information displays at stations other than main-line terminuses. I don't think one can really say that there has been an unusual rate of improvement post-privatisation; indeed, in some parts of the country improvements BR planned have not happened (for example, when I left Bracknell in 2004, slam-door EMUs were still running on that route.)

April

SunMonTueWedThuFriSat
    1
 
2
 
3
 
4
 
5
 
6
 
7
 
8
 
9
 
10 11
 
12
 
13
 
14 15
 
16
 
17
 
18
 
19
 
20
 
21
 
22
 
23
 
24
 
25
 
26
 
27
 
28
 
29
 
30